<rss version="2.0" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:trackback="http://madskills.com/public/xml/rss/module/trackback/">
    <channel>
        <title>Concord Bonds</title> 
        <link>https://concordbonds.com</link> 
        <description>RSS feeds for Concord Bonds</description> 
        <ttl>60</ttl> <item>
    <comments>https://concordbonds.com/Project-Updates/ID/28/April-2026-Update#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=28</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=28&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>April 2026 Update</title> 
    <link>https://concordbonds.com/Project-Updates/ID/28/April-2026-Update</link> 
    <description>Our Parks &amp;amp; Rec Bond Projects are making great progress and continue to stay on track&amp;nbsp;with our current timelines,&amp;nbsp;with the re-opening of Caldwell Park and the Academy-Gibson Athletic Fields on the horizon!

&amp;nbsp;

Caldwell Park:

We&amp;rsquo;re still on track to open this summer! Construction continued on the Robert Mathis Amphitheater continued this month, with the stage area concrete being poured. Crews also completed all underground electrical work and have completed all the additional sidewalks within the park. Next, crews will prep and pour the concrete underneath the covered basketball court area and begin installing playground and splashed equipment.



Robert Mathis Amphitheater Construction

&amp;nbsp;

J.E. &amp;ldquo;Jim&amp;quot;&amp;nbsp;Ramseur Park:

Site grading and storm drainage work continues at J.E. &amp;ldquo;Jim&amp;rdquo; Ramseur Park. Crews also started installation of the boardwalk that is part of the Clark Creek Greenway that connects to the new park. We&amp;rsquo;re still making great progress and anticipate opening&amp;nbsp;next summer.



Site Grading and Retention Wall Construction

&amp;nbsp;

Academy-Gibson Athletic Fields:

The installation of the turf fields is complete, including the logo and all lining work. The electrical work within the new storage and restroom facilities is also complete, as well as the&amp;nbsp;paved walking trail around Gibson Field.&amp;nbsp;The backstop fence posts have all been installed and renovations continue on the existing press box building. We&amp;rsquo;re looking forward to the re-openings of the Academy-Gibson fields this fall!



New Artificial Turf Baseball Field

&amp;nbsp;

David Phillips Park:

This project was recently put&amp;nbsp;out to bid and we anticipate construction beginning later this summer/early&amp;nbsp;fall and taking approximately 12 months to complete.

&amp;nbsp;

Academy-Gibson Skate Park, Pump Track, and Sculpture Garden:

This much-anticipated project is in the final design phase, with final plans going to City Council this summer.

&amp;nbsp;

The Poplar Tent Trailhead Park, Hartsell Park, Wilson Street Park, and W.W. Flowe Park are all in the design phase.&amp;nbsp;
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Thu, 23 Apr 2026 20:39:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:28</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/27/March-2026-Update#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=27</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=27&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>March 2026 Update</title> 
    <link>https://concordbonds.com/Project-Updates/ID/27/March-2026-Update</link> 
    <description>Crews continue to make great progress at Caldwell Park, J.E. &amp;ldquo;Jim&amp;rdquo; Ramseur Park, and the Academy-Gibson Athletic Fields!

At&amp;nbsp;Marvin Caldwell Park, crews installed additional sidewalks and curbing throughout the park. The fence posts along the baseball field is being installed and the contractor poured&amp;nbsp;the slab and&amp;nbsp;stairs for the Robert Mathis Amphitheater. Next, crews will finish installing the curbing along the playground and basketball court areas and build the retaining wall at the Amphitheater. Marvin Caldwell Park is still on track to open this summer.



Pictured above: Caldwell Park&amp;#39;s newly paved parking lot and basketball courts.

Crews at&amp;nbsp;J.E. &amp;ldquo;Jim&amp;rdquo; Ramseur Park&amp;nbsp;completed the waterline tap installation this month. Contractors continue to work on the Park&amp;rsquo;s mass grading and water drainage system installation.&amp;nbsp;Crews will continue working on retaining walls throughout the park. These walls stabilize areas of uneven ground, allowing us to maximize the available ground space at the new park.&amp;nbsp;J.E. &amp;ldquo;Jim&amp;rdquo; Ramseur Park is still on schedule to open next summer.



Pictured above: storm drainage system installation at Ramseur Park

The turf field is being installed at the&amp;nbsp;Academy-Gibson Fields, making a big visual impact on how much progress has been made so far.&amp;nbsp;Contractors installed the artificial turf on&amp;nbsp;Webb Field&amp;nbsp;and are&amp;nbsp;wrapping up&amp;nbsp;the centerfield&amp;nbsp;logo and line-work. The roofing of the bathroom and storage facilities, and the foundation for the new dugouts is complete.



Pictured above: artificial turf installation at the Academy-Gibson Athletic Fields.

The next project that will go out to bid and begin construction is&amp;nbsp;David Phillips Park. We anticipate construction beginning this summer and taking approximately 12 months to complete. Final design plans for the Academy-Gibson Skate Park, Pump Track, and Sculpture Garden&amp;nbsp;should be completed this summer, followed by the Poplar Tent Trailhead Park, Hartsell Park, and Wilson Street Park.
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Thu, 19 Mar 2026 19:46:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:27</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/26/February-2026-Update#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=26</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=26&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>February 2026 Update</title> 
    <link>https://concordbonds.com/Project-Updates/ID/26/February-2026-Update</link> 
    <description>
Since last month&amp;rsquo;s update, all buildings at Marvin Caldwell Park have&amp;nbsp;been built &amp;ndash; including the covered basketball court, restroom facility, amphitheater, and the Optimist Shelter. Crews are now beginning to paint and install the interior fittings. The splashpad has been poured and the main parking lot curbing has to be installed and the tennis court parking lot has been paved.&amp;nbsp;Caldwell Park is still on schedule to open this summer and will be home to the City&amp;rsquo;s first splash pad.


At J.E. &amp;ldquo;Jim&amp;rdquo; Ramseur Park, storm drain installation is still underway and crews have started installing the park&amp;rsquo;s water system. Crews have begun construction on the retention system that will manage water runoff near the parking lot.&amp;nbsp;J.E. &amp;ldquo;Jim&amp;rdquo; Ramseur Park, the City&amp;rsquo;s first park in the northwest, is still on schedule to open next summer.

At the Academy-Gibson Fields, crews have competed the installation of the sub-turf drainage system and are gearing up to install the turf field&amp;nbsp;once it&amp;rsquo;s delivered in early March. Plumbing and electrical work is complete in the storage and restroom facilities and the foundations for both buildings will be poured soon. Crews are beginning to install the border curb and fencing construction is underway. This project is still on track to be completed this fall.&amp;nbsp;&amp;nbsp;

The David Phillips Park&amp;nbsp;is still on track to be our next project that goes out to bid, followed by the Academy-Gibson Skatepark, Pump Track, and Sculpture Garden. The Poplar Tent Trailhead Park, Hartsell Park, and Wilson Street Park are still in the design phase.&amp;nbsp;

Each month during City Council&amp;#39;s regular meeting, Parks and Recreation staff provide a full update on the status of all Parks &amp;amp; Rec Bond projects. Tune in here&amp;nbsp;at the 18 minute mark for the full presentation from the February meeting.
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Tue, 24 Feb 2026 22:06:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:26</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/25/January-2026-Update#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=25</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=25&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>January 2026 Update</title> 
    <link>https://concordbonds.com/Project-Updates/ID/25/January-2026-Update</link> 
    <description>Construction Continues At Caldwell Park, Ramseur Park, and the Academy-Gibson Athletic Fields!

At Caldwell park, crews have been busy framing the amphitheater, covered basketball courts, and the restroom facility. The band shell style of the amphitheater roof is also featured on the restroom facility, giving the park a cohesive look. Crews started plumbing work within the restroom facility and laid the footings for the splash pad area.

Crews at Ramseur Park have been busy completing mainline sewer work and beginning installation on the stormwater underground detention cells. &amp;nbsp;The detention cells will be installed underneath the parking lot area of the new park to temporarily store large volumes of rainwater and release it slowly to prevent flooding and erosion. You can see the size of the large yellow detention cells beside the Conex container in the picture below&amp;ndash; they&amp;rsquo;re massive! To date, over 52,000 cubic yards of fill dirt was brought in and installed at the new park to level the site during the mass grading phase of the project.



Underground detention cells that will be installed underneath the parking lot at Ramsuer Park will provide stormwater runoff prevention.

Construction continues at the Academy-Gibson athletic fields as crews work on the subbase and drainage system for the new turf field. Renovations at the existing buildings at McAllister and Gibson Fields continues and the footers have been laid for the new storage building at Webb field.

City staff are working on the final permitting for the David Phillips Park and plan to take that project out to bid in late Winter. Final designs for the Academy-Gibson Skate Park, Pump Track, and Sculpture Garden, Poplar Tent Trailhead Park, Hartsell Park, and Wilson Street Park are still underway.

Each month during City Council&amp;#39;s regular meeting, Parks and Recreation staff provide a full update on the status of all Parks &amp;amp; Rec Bond projects. Tune in here at the 13 minute mark for the full presentation.
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Tue, 13 Jan 2026 17:54:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:25</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/24/December-2025-Update#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=24</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=24&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>December 2025 Update</title> 
    <link>https://concordbonds.com/Project-Updates/ID/24/December-2025-Update</link> 
    <description>This month, work has continued at Marvin Caldwell Park and crews are now identifying the exact location of the Splash Pad equipment! The restroom footings were completed and construction has officially begun on the restroom facilities within the park. The parking lot expansion is underway, and the sub-base of the new basketball courts has been applied.

At Ramsuer Park, a retaining wall is being constructed to help with stormwater runoff, curb and gutter work is underway in the new parking lot area, and a new water tap is being installed.

The Academy-Gibson Athletic Fields have been completely graded, and the proof roll of the artificial turf field is being installed. Crews have paved the walking path near the newly installed playground at Gibson Field, enhancing the areas park-amenities.

The next park anticipated to begin construction is Dave Phillips Park. Parks still in the design phase include the Academy-Gibson Skate Park, Pump Track, and Sculpture Garden, Hartsell Park, Poplar Tent Trailhead, and Wilson Street Park.

We share monthly progress updates at every City Council meeting. Tune in to our December 11 City Council Meeting at the 1:19:21 mark for the full update.
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Wed, 17 Dec 2025 18:12:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:24</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/23/November-2025-Update#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=23</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=23&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>November 2025 Update</title> 
    <link>https://concordbonds.com/Project-Updates/ID/23/November-2025-Update</link> 
    <description>At Caldwell Park, footings have been poured for all and shelters and buildings and electrical and plumbing stub-ups are currently underway. Over the next month, weather permitting, crews will be paving asphalt trails and poring concrete sidewalks. Installation will begin for the sports lighting that and stone work will soon be underway on the basketball courts. Crews will soon begin the plumbing work needed for the future splash pad.

At J.E. Jim Ramseur Park, mass grading is still underway and sanitary and sewer pipe is being installed. Over the next month, crews will continue this work and begin storm and sewer work in the main parking lot area of the future park. This project is still estimated to be completed in summer 2027.

At Academy-Gibson Fields, grading and soil removal is underway at Webb field and crews are prepping the base for the artificial turf installation. Crew are also continuing to grade and prep the site of the new restroom and storage buildings and installing a new gate to the parking lot on Balllpark Circle. At Gibson fields, crews are prepping the surface of a new paved walking path to give the field a neighborhood park feel since the playground was recently added to that site as well
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Sat, 15 Nov 2025 21:11:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:23</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/22/Academy-Gibson-Fields-Groundbreaking#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=22</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=22&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>Academy-Gibson Fields Groundbreaking</title> 
    <link>https://concordbonds.com/Project-Updates/ID/22/Academy-Gibson-Fields-Groundbreaking</link> 
    <description>For more than 100 years, the Academy-Gibson Athletic Fields have been a place where community comes together to cheer on the hometown, and where dreams are made and friendships are formed.&amp;nbsp;

On October 6, 2025, Mayor Dusch, members of Council, and City leadership, were joined by legendary Coach E.Z. Smith in officially breaking ground on planned field renovations.&amp;nbsp;The ceremony marked the start of a new chapter and continued legacy - ensuring the Academy-Gibson fields remain a place where sports teams and families can make memories for another 100 years.

As we look back in appreciation of our rich history born from Webb and Gibson fields, we&amp;rsquo;re excited for the many ways the bond renovations will enhance&amp;nbsp;Our City, Our Parks, and Our Future.

As part of our Parks &amp;amp; Rec GO Bond project, Webb Field will be getting an upgraded press box, new restroom facilities, and artificial turf.


</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Tue, 07 Oct 2025 17:37:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:22</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/20/August-2025-Update#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=20</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=20&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>August 2025 Update</title> 
    <link>https://concordbonds.com/Project-Updates/ID/20/August-2025-Update</link> 
    <description>Marvin Caldwell Park

Construction continue on Caldwell Park. The contractor continues to grade the area and work on underground infrastructure and utilities. Grading for paths and greenway areas has begun and foundations for structures are beginning to be laid. The project is still on track for a summer 2026 completion.

Pictured below, crews install backflows and new waterlines at Caldwell Park.

&amp;nbsp;&amp;nbsp;

&amp;nbsp;

J.E. Jim Ramseur Park

The construction fencing was installed along the permitted of the work zone and construction is underway. The contractor is working to clear trees and debris from the site and beginning preliminary grading work. Installation of Stormwater and sediment control ponds.

Pictured below is the progress made o nteh grading and clearing and J.E. Jim Ramseur Park.



Academy-Gibson Athletic Fields

During the August 14 City Council meeting, the Academy-Gibson Fields project was approved for bidding and work is expected to begin soon.

Projects Still In Design

David Phillips Park will be go out to bid next, expected to go before council in Fall 2025.

Projects still in design are the Academy-Gibson Skate Park and Pump Track and Sculpture Garden, Hartsell Park, and Poplar Tent Trailhead Park.

&amp;nbsp;

You can learn more about all the GO Bond Park projects by tuning into the livestream of the August 14, 2025 City Council meeting, beginning at the 10 minute, 14 second mark.
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Tue, 19 Aug 2025 12:22:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:20</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/17/June-2025-Update-Work-Continues-At-Caldwell-Park#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=17</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=17&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>June 2025 Update: Work Continues At Caldwell Park</title> 
    <link>https://concordbonds.com/Project-Updates/ID/17/June-2025-Update-Work-Continues-At-Caldwell-Park</link> 
    <description>Contract crews continue storm drainage work and grading at Caldwell Park. So far, the project schedule is still on track with the anticipated opening in Summer 2026.



Pictured above, Caldwell Park Construction

A Groundbreaking Ceremony was held on June 9 for the future J.E. &amp;quot;Jim&amp;quot; Ramseur Park. The notice to proceed with construction was given to the contractor, J.D. Goodrum, and work will soon begin on the new park. Construction is anticipated to take 2 years to compete, with a projected opening in Summer 2027.



Pictured above, the J.E. &amp;quot;Jim&amp;quot; Ramseur Park Groundbreaking Cermony

Next, bid documents will be prepared and bidding will begin for the Academy-Gibson Athletic Fields and the David Phillips Park projects. The Academy-Gibson Skate Park and Pump Track, as well as Hartsell Park, are still in the design phase.

Our next Community Bond Update meeting is scheduled for Wednesday, June 25 at the Hartsell Recreation Center. Our Parks and Rec team will share more about our park designs, anticipated timemlines, upcoming park closures, and more! We hope to see you there.We’ll
 be sharing more about the progress we’re making on park designs, 
upcoming construction, park closures, and anticipated timelines. We hope
 to see you there!We’ll
 be sharing more about the progress we’re making on park designs, 
upcoming construction, park closures, and anticipated timelines. We hope
 to see you there!
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Tue, 17 Jun 2025 13:27:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:17</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/15/May-2025-Update-The-McInnis-Aquatics-Center-is-Almost-Ready-for-Pool-Season#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=15</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=15&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>May 2025 Update: The McInnis Aquatics Center is Almost Ready for Pool Season</title> 
    <link>https://concordbonds.com/Project-Updates/ID/15/May-2025-Update-The-McInnis-Aquatics-Center-is-Almost-Ready-for-Pool-Season</link> 
    <description>The construction at the McInnis Aquatics Center is still on track to be completed before the summer swim season begins on Saturday, May 24. The concrete deck was poured and prepped and the new pool plaster was installed earler this month. The new walk-in feature looks great and will improve the pool&amp;#39;s inclusivity, allowing individuals in wheelchairs the ability to enjoy our aquatics center. If you haven&amp;#39;t already, visit the City&amp;#39;s main website to learn more about our pool hours, swim lessons, and season passes.



Construction nears completion at McInnis Aquatics Center

Construction continues at Marvin Caldwell Park as they continue storm drain installation and mass grading. The contractor plans to begin building foundations next month. We&amp;#39;re still on track to complete and re-open Marvin Caldwell Park in Summer 2026.



Construction continues at Marvin Caldwell Park

The next project set to begin is our newest park in the Western portion of our City - J.E. &amp;#39;Jim&amp;#39; Ramseur Park. We will be hosting a groundbreaking ceremony for this project on June 9 at 2:00 P.M.

&amp;nbsp;
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Tue, 20 May 2025 12:38:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:15</guid> 
    
</item>
<item>
    <comments>https://concordbonds.com/Project-Updates/ID/12/Construction-Continues-At-Dorton-Park-Caldwell-Park#Comments</comments> 
    <slash:comments>0</slash:comments> 
    <wfw:commentRss>https://concordbonds.com/DesktopModules/DnnForge%20-%20NewsArticles/RssComments.aspx?TabID=540&amp;ModuleID=1293&amp;ArticleID=12</wfw:commentRss> 
    <trackback:ping>https://concordbonds.com:443/DesktopModules/DnnForge%20-%20NewsArticles/Tracking/Trackback.aspx?ArticleID=12&amp;PortalID=1&amp;TabID=540</trackback:ping> 
    <title>Construction Continues At Dorton Park, Caldwell Park</title> 
    <link>https://concordbonds.com/Project-Updates/ID/12/Construction-Continues-At-Dorton-Park-Caldwell-Park</link> 
    <description>Work is continuing at Dorton and Caldwell Park and the renovations at the McInnis Aquatic Center are making progress!

During the January City Council meeting, our Parks and Rec staff shared an update on all the bond projects. You can view the meeting here.

Dorton Park

As construction nears the final stages, we&amp;#39;re still on track for an April 2025 reopening for Dorton Park. The Afton Run stream restoration, tennis courts, multi-purpose field, shelters, restroom expansion, greenways, and the parking lot expansion are all complete! We&amp;#39;re working to finish the sidewalk paving and railings, landscaping, and the disc golf course. We&amp;#39;re excited for the new Gametime playground to be installed next month!

Pictured below: Crews install sidewalks at Dorton Park

&amp;nbsp;

Pictured below: the new restroom at Dorton Park



Academy-Gibson McInnis Aquatic Center

Excavation is now complete at the McInnis Aquatic Center and materials have been ordered. Next steps will include plaumbing work, replacing the main drain, and resurfacing the area of the pool. We aticipate the aquatic center to reopen in spring 2025, ahead of the summer swimming season!

Pictured below: Excavation at the McInnic Aquatic Center



Caldwell Park

Construction is officially underway at Caldwell Park! Crews have installed construction fencing around the worksite and demolishion has started. First, their working to address stormwater control run-off near Irish Buffalo Creek. We anticipate the park will reopen in summer 2026.

Pictured below: Construction underway at Caldwell Park



Pictured below: Demolistion at Caldwell Park



Pictured below: Stormwater work at Caldwell Park



Pictured below: Construction fencing installed at the Caldwell Park construction site



&amp;nbsp;
</description> 
    <dc:creator>Megan Redford</dc:creator> 
    <pubDate>Thu, 23 Jan 2025 13:30:00 GMT</pubDate> 
    <guid isPermaLink="false">f1397696-738c-4295-afcd-943feb885714:12</guid> 
    
</item>

    </channel>
</rss>